Costs to build a Class Globe 5.80
Published
in Building
on Apr 2, 2025
A breakdown of the costs to build s/v 29
Date | ITEM(S) | $ USD |
---|---|---|
04.02.25 | Plans | 300.00 |
04.02.25 | Stailess Steel Pack | 1,100.00 |